Saturday 26 May 2012

Kit picked up!

A long day yesterday, 8am start - hire the van, set out en-route around 9.30am, arriving at GBS around 2pm;

Good support from the team at GBS talking through the build, general advice etc then checking through the order.


I ordered virtually a complete kit so it took the best part of 3 hours to check everything against the list and load into the van. I happened to have rented an extra long wheelbase van which was easily filled by all the boxes.


Of the 100s of parts half a dozen will follow later;


Richard designed a spare wheel carrier for me, removable and integrated into the chassis - otherwise the Kit is standard.


Got home around 9:40pm, lost the light around 10pm, first chance to use the engine hoist (in darkness) to get the motor out of the van, and finished unloading by about 11:00pm:


Note; the bonnet (sitting on top in this picture) is rolled and edges formed as standard now; + the main right angle bend on the rear panel:

Its all tidy at this point:

And now not so much,...  ready to sort out a little:

Again panels - it looks like the side panels have changed a little - larger floor 'triangles' built in and all bent/formed up (bottom left of this picture against the wall):


The picture on the wall is to provide inspiration and make sure I don't lose sight of the wood for trees!

+ the GRP panels are currently sitting in the conservatory loft space.

First build task - sort all this stuff out so I can move in the garage;
Need to find somewhere to put the tyres on the wheels which will save some space too.

Busy - but very productive day!

No comments :

Post a Comment